Tape machine installation

Aug 07, 2021

1. The site for site selection and installation of the belt conveyor must be on a relatively flat hardened ground, because the belt conveyor requires a good environment when operating. It cannot be said that the ground is bumpy, and the various parts of the operation are not coordinated, which makes the product produced Unqualified! All this needs to be considered.

2. Assemble the machine. Generally, the components of the belt conveyor are separated. Before installation, after the site is selected, place the front and rear middle racks on a level ground to maintain a uniform horizontal line! To maintain stable operation.

3. After the installation is complete, perform pre-processing on all parts of the machine, including chains, sprockets, bearings, reducers, and add lubricating oil or grease.

4. After the lubrication treatment, debug the main components to keep them rotating smoothly without blocking.

5. After the installation of each part is completed, turn on the power to test the machine! There is no need to install materials during the test machine, and carry out a bare test! Observe the operation of each component! If an abnormality is found, the power will be cut off,

6. When the belt conveyor is not running, the power supply must be disconnected for safety.