The process before the operation of the transformer winding machine.

Check before turning on the power, before turning on the power, you need to check the winding machine first to ensure that no major problems are found.
2. Power on the heat engine. After the power is turned on, the heat engine needs to be operated. After all parts are running normally, the next step is performed.
3. Set the parameters, according to the latest processing requirements, set the corresponding parameters in the winding machine.
4. Debugging. After the parameters are set, debugging must be done to ensure the coordinated operation of all parameters and parts of the winding machine, and the quality of the products produced meets the standard.
5. Small batch production, if it is a transformer model that has not been produced before, a small batch trial production is required first.
6. For formal production, products that have not been tested in small batches must be informed by professionals on the spot to ensure that the machine can operate normally before handing over to the operator for operation.