What are the basic operating steps before using the transformer winding machine?

1. Check before starting, power on, before starting, you need to check the winding machine first.
2. Power on the heating machine. After the power is turned on, the heating machine needs to be operated. Then the winding machine enters a normal state of power-on and ventilation, and each part is in normal operation before the next step.
3. Set the parameters, find the corresponding material specifications and models according to the latest processing requirements, and set the corresponding parameters in the winding machine.
4. Debugging. After the parameters are set, it does not mean that it can be produced directly. Debugging must be done to ensure the coordinated operation of all parameters and parts of the winding machine, and the quality of the products produced.
5. Small batch production, if it is a transformer model that has not been produced before, it is necessary to conduct a small batch trial production to ensure that no major problems occur.
6. Formal production. If there is no small batch, it will be put into production in large quantities. At the beginning, the engineering and technical personnel must be on duty to ensure that the operation is good before handing over to the operator to operate!






