Contact Us
- The Fourth Floor, A-A3 Zone, Aviation Business Area, DongLi Distrct, Tianjin, China.
- >salesmanager@coilwinding machinechina.com
- +8618622096679


Manual E I Insert Machine
Insert machine operating manual 1. Place the insert machine on the horizontal workbench and put the silicon steel sheet into the position marked as shown in the figure. 2. Rotate the hand wheel in a clockwise direction and take out the two or two I tablets that were pushed out first. 3. Insert...
Description
Insert machine operating manual
1. Place the insert machine on the horizontal workbench and put the silicon steel sheet into the position marked as shown in the figure.
2. Rotate the hand wheel in a clockwise direction and take out the two or two I tablets that were pushed out first.
3. Insert two "E" pieces into the transformer wire circle, and put them into the insert seat according to the direction of silicon steel sheet insertion.
The left hand protects the transformer, the right hand slowly shakes the hand wheel, and the speed is from slow to fast.
(Skilled operation, transformer coil can be directly inserted into the insert seat insert)
Matters needing attention
(1) During the insert process, the hand wheel rotates in a clockwise direction.
(2) When inserting full pieces, the speed is slow, and the light voltage transformer wire circle is inserted full of EI pieces.
Adjustment method
insert thickness 0.35MM silicon steel sheet method.
(1) Take out the bottom gasket of the two pusher blocks, adjust the gap between the pusher blocks and the EI block of the insert seat,
After the front end of the push block pushes the EI sheet out of the press, the gap between the EI sheet and the press sheet is 1MM
(2) Loosen the screws of the front column and the middle column, and adjust the gap at the bottom of the front middle column according to the following table size with the feeler ruler.
|
|
(Unit: MM) |
Thickness of silicon steel sheet |
Front column bottom clearance |
Bottom space |
0.35 |
0.4-0.45 |
0.45-0.5 |
0.5 |
0 . 5 5 - 0 . 6 5 |
0. 6-0. 75 |
(Note: When adjusting 0.5MM silicon steel sheet, the gasket should be padded back) |
Maintenance
1. In order to make your equipment stable and efficient, pay attention to regular maintenance, the sliding parts of the machine must add white mineral oil every week
(clothes car oil) lubrication, with a cloth to clean the surface of the silicon steel sheet, left burrs, and particles.
2. Find out the cause of the fault and eliminate it. It is strictly prohibited to strike the fuselage and parts with iron. Do not magnetize the body with magnets.
If the E1 piece is found to be stuck, the EI piece should be withdrawn back, not a strong pull and iron strike, to avoid damage to the parts.
General Troubleshooting
Breakdown |
Causation |
Elimination method |
EI chip can not push out, impact |
The Ei sheet is uneven and curved |
Bend down |
E-piece coil internal collision |
Insert block is too low or worn |
Import block up \ or replace |
The sound of a crash in small amounts |
Fuselage or front column with magnetic |
Demagnetizing ~ |
Other |
unspecified |
Contact the manufacturer |
Hot Tags: manual e i insert machine, China, suppliers, manufacturers, factory, price, made in China, Hook Type Toroidal Winding Machine, Digital CNC Wire Coil Winding Machine, Toroidal Transformer Winding Machine, High Speed Automatic Coil Winding Machine, Automatic Toroidal Taping Machine, Automatic Winding Machine For Transformer
You Might Also Like